One of the first questions homeowners ask when considering custom furniture is simple and completely reasonable:

“How long does it take?”

At Luke’s Furniture Company, the honest answer is this:

Most custom furniture projects take anywhere from 3 to 6 months from order to delivery.

That may feel long compared to buying furniture online—but there’s an important distinction most buyers don’t realize:

The actual build only takes about one month.
The rest of the timeline is intentional and essential to quality.

This article breaks down exactly where that time goes, why it matters, and what you can expect at every stage of the process.


The Big Picture: A Realistic Custom Furniture Timeline

For most projects at Luke’s Furniture Company, the timeline looks like this:

  • 2–5 months: Waitlist before the build begins

  • 1 month: Lumber acclimation in climate control

  • ~1 month: Active build and finishing

  • Total: 3–6 months from order to delivery

Each phase serves a purpose—and skipping or rushing any of them compromises the long-term quality of the piece.


Phase 1: Design Consultation & Order PlacementLukesFurniture-25

The process begins with a detailed conversation about how the piece will be used, where it will live, and what matters most to you.

This phase includes:

  • Confirming dimensions and proportions

  • Choosing wood species

  • Selecting a finish

  • Discussing lifestyle needs (kids, pets, daily use)

  • Aligning expectations on timeline and budget

Once the design is finalized and the order is placed, the project enters the production queue.

Why this matters for timing:
Custom furniture doesn’t start immediately. Each piece is built one at a time, in order, rather than rushed through a production line.


Phase 2: The Waitlist (2–5 Months)LukesFurniture-21

This is the longest part of the process—and the most misunderstood.

Luke’s Furniture Company operates with a controlled production schedule to ensure:

  • Consistent quality

  • Proper attention to detail

  • No shortcuts or rushed work

Your project may sit in the queue for 2 to 5 months before the build begins, depending on:

  • Current workload

  • Time of year

  • Project complexity

Why a waitlist is a good sign:
A backlog often indicates demand for craftsmanship, not inefficiency. It allows each piece to receive full focus once work begins.


Phase 3: Lumber Selection & Climate-Controlled Acclimation (1 Month)IMG_4048

Before any cutting or assembly happens, solid wood must be allowed to acclimate.

At Luke’s Furniture Company:

  • Lumber is brought into a climate-controlled shop

  • Moisture content stabilizes to match indoor conditions

  • Boards are evaluated for grain, color, and character

This acclimation process typically takes about one month.

Why this step cannot be rushed:
Wood is a natural material that expands and contracts with humidity. Skipping proper acclimation increases the risk of:

  • Warping

  • Cracking

  • Seasonal movement

This step is especially critical in coastal and humid climates like southeastern North Carolina.


Phase 4: The Build Process (Approximately 1 Month)LukesFurniture-11

Once acclimation is complete, the active build begins.

This phase includes:

  • Milling lumber flat and square

  • Cutting components to precise dimensions

  • Creating strong, long-lasting joinery

  • Shaping bases, legs, or profiles

  • Assembling the piece

  • Sanding and surface preparation

Although this is often referred to as “the build,” it’s actually many small, careful steps layered together.

Important clarification:
The build itself takes about one month, not several. The longer overall timeline comes from preparation and scheduling—not slow craftsmanship.


Phase 5: Finishing & Cure TimeFinishing Walnut

Finishing is both a visual and protective step.

At Luke’s Furniture Company:

  • Finishes are selected for durability and real-world use

  • Multiple coats may be applied

  • Proper cure time is allowed before delivery

This ensures the finish reaches its full hardness and durability before the piece enters your home.

Why cure time matters:
Using furniture before the finish has fully cured can reduce resistance to heat, moisture, and wear—especially on dining tables.


Phase 6: Final Inspection & Delivery CoordinationEric-4-1

Before delivery:

  • The piece is carefully inspected

  • Final touch-ups are completed

  • The furniture is protected for transport

  • Delivery or installation is scheduled


Why Custom Furniture Takes Longer Than Retail (By Design)

Mass-produced furniture is optimized for speed and volume. Custom furniture is optimized for longevity.

The extended timeline allows for:

  • Proper wood acclimation

  • Strong joinery instead of fasteners

  • Durable, long-lasting finishes

  • Careful sanding and prep

  • One-at-a-time attention

These are the exact things that prevent problems years down the road.


Common Questions About Custom Furniture Timelines

Can the process be rushed?

Rushing often leads to future issues. While minor adjustments are sometimes possible, shortening acclimation or cure time is never recommended.

Does every project take 6 months?

No. Smaller or simpler pieces may be closer to 3 months, while large dining tables or multiple-piece projects trend toward 5–6 months. Our waitlist also fluctuates. Feel free to give us a call at 91--613-0641 to get our current waitlist time.

Is the waitlist negotiable?

The waitlist exists to protect quality. It ensures each project receives proper time and attention.


Is Custom Furniture Worth the Wait?

For homeowners who value:

  • Exact sizing

  • Long-term durability

  • High-quality materials

  • Furniture built for daily life

…the answer is almost always yes.

Rather than replacing furniture every few years, custom pieces are designed to live in your home for decades—and can be repaired or refinished as needed.


How to Help Keep Your Project on Schedule

You can help avoid delays by:

  • Finalizing design decisions early

  • Responding promptly during approvals

  • Avoiding mid-build changes when possible

  • Trusting the recommended timeline

Clear communication benefits everyone involved.


Final Thoughts: Time Well Spent

Custom furniture isn’t about speed—it’s about intention.

The 3–6 month timeline reflects careful planning, proper material handling, and craftsmanship built to last. When your furniture finally arrives, it isn’t just new—it’s stable, durable, and designed specifically for your home.


Planning a Custom Furniture Project?

If you’re considering custom furniture and want a clear, realistic timeline from the start, we’d be happy to talk through your project.